Monday, June 29, 2015

A Roof Job



     We just finished another roof job.  All the materials had to carried in.  A 2 hour walk from the foot of the mountain.
h
 

     The rafters and all roof materials were metal.  All was pre-drilled and then bolted together after arriving at the job site.



No comments:

Post a Comment