Monday, September 22, 2014

The Roof is On the Leogane Church


     A view from the inside of the church after the roof is put on.






        A side view of the roof.





     
 

        A front view of the roof.

Saturday, September 20, 2014

Doors and Iron on the Windows and Primed




     The doors and the iron on the windows are now primed.  The plastering was finished also.
We are now ready for the roof.


Friday, September 19, 2014

The Doors are Installed and the Decorative Iron on the Windows






        The doors are now installed and there is iron on the window openings.  The finishing touches before the roof.

Wednesday, September 17, 2014

Plastering the Walls at the Leogane Church




    We added 24 inches to the height of the walls of the church.  



Tuesday, September 16, 2014

Working on the Blocks and the Roof at Leogane






         The rafters have been set and the steel roofing will soon be installed.


        A view of the rafters from the inside



     Trying to salvage some of the wood from the old tresses.