Monday, September 22, 2014
The Roof is On the Leogane Church
A view from the inside of the church after the roof is put on.
A side view of the roof.
A front view of the roof.
Saturday, September 20, 2014
Doors and Iron on the Windows and Primed
The doors and the iron on the windows are now primed. The plastering was finished also.
We are now ready for the roof.
Friday, September 19, 2014
The Doors are Installed and the Decorative Iron on the Windows
Wednesday, September 17, 2014
Tuesday, September 16, 2014
Working on the Blocks and the Roof at Leogane
The rafters have been set and the steel roofing will soon be installed.
A view of the rafters from the inside
Trying to salvage some of the wood from the old tresses.
Wednesday, August 27, 2014
Repairs to the Leogane Church and Property
A steel cover to conceal the valves for the water line.
One of the gates on the property that was repaired. Rusted sections were cut out of it and new track and rollers installed.
New steel reinforced concrete posts were placed on the corners and at each side of the doorway.
Thieves have removed sections of our chain link fence that surrounds the property. There have been two occasions where they came and removed sections of fencing.
The tresses are being made for the roof. They will be painted before they are installed.
The tresses are stacked in half sections along the wall in the garage.
Making Futons
The metal frame.
The painted frame with drawers
The futon opened as a bed. The cushions are not yet covered.
The cushions are covered. There are still some finishing touches to be made.