Wednesday, November 18, 2015
The Wall is Now Plastered
There are a few places to touch up on the wall and then it can be painted. This is a project that needed to be done a long time ago. We are so happy to have the wall back up once again.
Escotte and Manouchka's Wedding
The bride and groom
The best man and the maid of honor
Kneeling to pray
Classes Begin in the Seminary
This is a group of our 3rd year students during Greek class.
I have the students go to the chalkboard often and have them participate in the classroom. Much homework is required for the class also.
These are 1st year students during English class. They have expressed that they really enjoy the class.
Making Cabinets for Escotte's House
The wedding day was approaching and we needed to get the kitchen cabinets done.
Several days after the wedding we were able to install the kitchen cabinets, finish the roof on the back of the house, and install a front entrance door.
Progress on Minal's Foundation
The rock foundation is up to floor level. The inside of the foundation needs to be filled in with rocks and dirt.
Josiah Ickes is helping unload a load of gravel to fill in the foundation.
Repairs Begin to the Front Wall to the Street
Upon returning to Haiti in September we immediately began to rebuild the front wall to the property that connects to the main avenue. Josiah Ickes came to lend us a hand.
Subscribe to:
Posts (Atom)