I spent several days working with the boys that I am mentoring and orphan boys. We were able to do some work projects to further the finish work on the mission house.
A rain gutter installed, a hand railing on the stairs, the porch enclosed with decorative iron, and a support post under the stairs.
The drywall is finished and a prime coat of paint applied.
The large front room.
The front bedroom.
A vanity for the master bathroom.
Shelves and clothes rods were installed in the walk in closet. It has since been painted.
Monday, July 4, 2016
Subscribe to:
Posts (Atom)