We've been working on the kitchen cabinets this week.
Sonson and I working of the styles.
We got all the boxes made.
Now for the drawers, doors, sink, and counter top.
Saturday, November 29, 2014
Saturday, November 15, 2014
Rooms as the Remodeling Progresses
Sunday, November 9, 2014
Progress on the Guest Apartment
The walls are being tiled. The young men I mentor are learning to lay tile.
The rooms are getting a fresh coat of paint.
The closets were removed to be repaired and tiles placed on the floor.
The bedrooms are finished.
Repairs to Guest House
The supply line to the toilet became brittle and broke in the guest apartment. Nobody had been in the apartment for several weeks. When we discovered the leak the damage was already done. The linoleum floor tiles all lifted in 4 rooms, the bottom of doors were water soaked and separated, the closets were damaged at the bottom, and water marks were left on the walls.
The apartment was gutted and we began repairs. The first thing we done was to replace the floor with ceramic tiles. Pictured is a section of the design in the floor.