Sunday, November 9, 2014
Progress on the Guest Apartment
The walls are being tiled. The young men I mentor are learning to lay tile.
The rooms are getting a fresh coat of paint.
The closets were removed to be repaired and tiles placed on the floor.
The bedrooms are finished.
Repairs to Guest House
The supply line to the toilet became brittle and broke in the guest apartment. Nobody had been in the apartment for several weeks. When we discovered the leak the damage was already done. The linoleum floor tiles all lifted in 4 rooms, the bottom of doors were water soaked and separated, the closets were damaged at the bottom, and water marks were left on the walls.
The apartment was gutted and we began repairs. The first thing we done was to replace the floor with ceramic tiles. Pictured is a section of the design in the floor.
Tuesday, October 21, 2014
Pastor Wilner and the Refinished Pulpit
Paster Wilner standing behind the pulpit. The men in the background are putting shields and screws into the block walls to hang decorations.
Saturday, October 18, 2014
Repairing the Pulpit
The pulpit was in bad shape. The plywood was separating and pealing off. We put on new veneer plywood and gave it a face lift. We will be giving it a coat of varnish soon.
Saturday, October 4, 2014
Wednesday, October 1, 2014
A Coat of Paint - Leogane
The project is coming to a end. We have painted the building inside and out. There are still some finishing touches to be made.
Monday, September 22, 2014
The Roof is On the Leogane Church
A view from the inside of the church after the roof is put on.
A side view of the roof.
A front view of the roof.